It is widely used for quilting high-quality bedding covers, quilt covers, garments, seat-covers and household ornaments.
Port: ShenZhen
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 360 Set/Sets per Month
Payment Terms: L/C,T/T
Contact SupplierPackaging Detail: sea worthy packing.
Delivery Detail: 30DAYS AFTER RECEIVE THE DEPOSIT ,
CS64 Digital Control Quilting machine
Main features:
Quilting width | 64inch | Overall dimensions | 2Needle row 3600*1100*1600mm 3Needle row 3800*1200*1650mm |
Needle distance | 25.4mm | Needle row distance | 1-2:3inch 2-3:3inch 1-3:6inch |
Net weight | 2Row:2300kg 3Row:2600kg | Gross weight | 2400kg 2700kg |
Running speed | 200-500r/m | Output | 20-100m/h |
Max.thickness | 30mm | Max.pattern size | 2 Needle Row (6inch by 6inch )(catercornered distance) 3Needle Row 12inch by 12inch |
Voltage | 380v 3 phrase | Power | 3.5kw |
X stroke | 8inch (203.2mm ) 12inch(304.8mm) | Stitch length | 2-6mm adjustable |
Payment term:
Take 30% of the total price as advance payment by T/T,the balance should be paid off before delivery by T/T.
Packing :
ChiShing company's normal export packing (oiling+ plastic paper packing +fabric and polyester fiber packing
then fixing )
Installation:
The seller is responsible for installation and debugging. The whole installation will take7to10 days,and the seller
will send 1 engineer for installation.The buyer is responsible for the roundtrip airplane tickets,accommodation,
medical treatment, safety and relative fees.
In addition the buyers should assign workers, electrical wire outside the electric cabinet and tools for installation
to cooperate with the work. The installation cost USD50/Day will be paid by ChiShing.
Guarantee:
The seller is responsible for changing the parts which have the quality problem of the machines in one year,
but except from the wearing parts and the quality problem were leaded by wrong operation and other man
made factors,and the quality problem should be confirmed by two sides.
Delivery term:
Normally the goods will be delivered within 30-45days after received the 30% of the contract value. (But the delivery term can be adjusted according to
practical situation)