1) best quality alloy stainless steel;
2) independent heating system;
3) solid forging,peripheral drilling.
Port: Shanghai
Minimum Order Quantity: 1 Set/Sets
Supply Ability: 60 Set/Sets per Year
Payment Terms: T/T
Contact SupplierPackaging Detail: plastic film and container
Delivery Detail: 90 days around
1) Structure of calender machine: Two-roller Stand-up calender machine;
2) Heat treatment of Calender Roller: quenched and tempered, roller body medium frequency quenching to the requirements of buyer;
3) Roller pattern: up to the requirements of buyer;
4) Roller heating: heated by conduction oil;
5) Safety precautions: top roller protective cover, electrical equipment emergency stop switch.